Files
giza-kmp/docs/rotate-shares-single-approval.md
T
Kgothatso NgakoandClaude Opus 5.5 cc21d68356 feat: the Shares section says whose share a rotation takes away; the record (admin-change-rotation, Phases 7 and 8)
The running card names the members whose share it takes away because
the group removed them as admin, and their rows read Share being
rotated away instead of Holds a share. Removing an admin says nobody
is asked again.

The plan is marked built, with where the build chose differently, and
the notes it changes point to it.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-20 11:11:32 +02:00

36 KiB
Raw Blame History

Taking part is the only approval

A plan to make a share rotation run by itself once a member has agreed to take part. The member decides one thing: whether to take part in this rotation, with these members withheld. Their device does everything after that. It deals its part, checks the combined result, stores the new share, confirms it, signs the group's new key state, and deletes the old share. Abandon stays, because the one stall automation cannot fix is a member who agreed and then went quiet.

This is the same change automatic-key-ceremony.md made to the ceremony, applied to frost-share-refresh.md. Read both first. This plan follows the first one's shape, because the reasoning is the same and so are most of the traps.

Built, one commit per phase on claude/rotate-shares-single-approval-338a7d (18f426ca to the commit that adds this header), against fc437d05, on 2026-11-20. Each recipient is now asked once and the proposer not at all: ShareRefreshRitualJvmTest's answerEverything counts the asks, and they went from three per recipient to one. jvmTest 1250/1250, compileDebugKotlinAndroid, m3Audit at its budgets, the brand and wallet audits. The phases are kept as written because they are the reasoning. Where the build chose differently:

what the plan said what it turned out to be
Phase 1: three asks per recipient, the proposer included two for the proposer. Its device proposes the key state, and a proposer's signature is its proposal. The pinned test said so, and Phase 4 took the proposer to none
Phase 2: the fork test, two proposals with an overlapping recipient who confirms one two proposals opened at once never reach the write-once rule. Each device refuses the second on arrival ("another refresh of this key is still running here"), and the refusals end both. The test asserts what matters, that the group never splits. The write-once rule keeps its own test, against the DAO, which never involved the gate
Phase 2: a tampered sum fails on every honest recipient it fails on every device, the coordinator included, through the FAILURE an honest recipient broadcasts. The coordinator used its own untampered sum and had confirmed
Phase 3: rename resumeRunningCeremonies or widen its KDoc widened. It now also runs ShareRefreshManager.resumeRunning and, from Phase 5, FrostSigningManager.resumeVouched
Phase 4: rotationPreview runs the same selection as proposeRefresh both call one private ShareRefreshManager.plan, which also carries the refusals that were requires. Those now throw IllegalStateException rather than IllegalArgumentException. The removal dialog names only the stale members, since its title already names the removed one
Phase 5: re-check vouching in resumeAt and the sweep one approveIfVouched behind all three: arrival, resumeAt, and resumeVouched. The sweep answers any key state the device can vouch for, a ceremony's included, through a new getOpenUnansweredSessionsFor
Phase 5: path and parent match the room's signed state the birth certificate is compared by event id, not JSON. No test has a signed generation-0 state to differ from, since the ritual harness's devices hold none, so the test breaks the path against rule 4 instead
Phase 6: the running card shows who it waits on and since when, with an inline abandon past a day always shown, with no threshold. Unlike a ceremony, a rotation has no screen of its own, so the card is the only place it can be seen at all. Abandon got a confirmation dialog, since the Shares section had none
Phase 6: running until the key state is signed while that signature is open. A key state nobody is asking for would otherwise read as one under way, forever
Phase 6: fix record the way the ceremony's was record and publishOwn both. The first version of the test passed without the fix: timestamps are kept to the second, and a redelivery in the same second looks identical. The test now backdates the messages a day first, and fails with the old behaviour put back
(not in the plan) one full jvmTest run died on a SIGSEGV in SQLite's native code (sqlite3DbMallocRawNN), inside a background MarmotKeyPackageDao.upsert. That looks like an existing test leaving a write running against an in-memory database it has closed. The rerun was clean. Not investigated

Merged into giza alongside rotation-waits-for-key-state.md, built in parallel from the same base. The two agreed on not asking the proposer; where they met:

  • The proposer's dialog is this note's (previewRotation, read from plan, with the refusal), under that note's title and caveat. Its own dialog, which listed stale members from the summary, went; ChatRoomDetailSharesJvmTest asks the same question of this one. The preview's refusal now carries rotationHold's reason.
  • The proposer is approved to take part only. That note also set confirmApprovedAt, which nothing reads any more.
  • The Shares section has both: that note's held button, its reason and "Ask the group to sign", and this note's running card and abandon.
  • That note's hold tests waited on a key state nobody had signed by simply not signing it. That state signs itself now, so they hold the signing messages after the proposal (signingHeldOpen) to look at it.
  • This note's test of two rotations opened at once gave way to that note's, which asserts the same and more.

Not done: the emulator session in Phase 7. Nothing here has run on a device: not the dialog, not the card, not the upgrade in place.

The headline: a device asks its owner only for decisions it cannot make on its own. Taking part is one of those decisions, because it agrees to the withheld list, and withholding someone takes their signing away. Storing the new share is not a decision. The device has already checked the combined result against the commitments and the table before it asks, and a person tapping Approve under "Store your new share" adds nothing to that check.


What a member is asked today

A rotation in a room whose key is t-of-n. Today every recipient is asked three times, not two. The third ask is easy to miss because it looks like an ordinary signing request rather than part of the rotation.

# step whose today after this plan
1 propose the rotation proposer Rotate shares button, no dialog, or the dialog after a removal a dialog naming who takes part and who is withheld. Pressing it is the proposer's approval (R2)
2 deal round 1 (DEAL) every recipient, proposer included Shares section row, Take part in rotating the shares unchanged: the one approval. The row now names who is withheld
3 sum round 1 (cmsg1) coordinator automatic automatic
4 check, store the pending generation, send CertEq (CONFIRM) every recipient Shares section row, Store your new share automatic. If the check fails, the rotation fails and says so, as it does today
5 certificate, activate g+1 coordinator, then every device automatic automatic
6 propose the g+1 key state coordinator automatic (proposeGeneration) automatic
7 sign the g+1 key state every recipient, t needed signing approval, because vouchesFor rule 8 refuses any state with a generation (fc437d05) automatic when the state is exactly the one this device's own completed rotation implies (Phase 5). Asked as today otherwise
8 wipe generation g every device automatic once 7 is signed automatic
— abandon any recipient only on a pending approval row kept, and reachable for the whole run (Phase 6)

Today a recipient taps at rows 2, 4 and 7, and the proposer taps the button and then rows 2, 4 and 7 as well. After this plan a recipient taps once, and the proposer taps once.

Where the gates are

finding where
G1. advance stops before round 1 until dealApprovedAt is set ShareRefreshManager.kt:391
G2. advance stops before round 2 until confirmApprovedAt is set ShareRefreshManager.kt:415
G3. pendingApproval mirrors G1 and G2, and must keep doing so ShareRefreshManager.kt:589-600
G4. The proposer is approved for nothing on proposal, by design ShareRefreshManager.kt:111-116, asserted by ShareRefreshRitualJvmTest "nothing of a member's own goes out before they approve"
G5. A rotation's key state is never vouched for: vouchesFor rule 8 GroupKeyStateManager.kt:659-660
G6. Vouching is decided once, on the proposal's arrival. A device that receives the g+1 key state before its own rotation has activated g+1 cannot vouch for it then, and nothing asks again FrostSigningManager.kt:447, resumeAt at :1945
G7. Nothing resumes a rotation except an arriving message. The sweep covers ceremonies only DatabaseNostrRepository.resumeRunningCeremonies calls ChillDkgRitualManager.resumeRunning and nothing else
G8. The Shares section shows REFRESH_CONFIRM as its own row, with its own string SharesSummary.kt:24, DatabaseChatRepository.kt:674, ChatRoomDetailScreen.kt:406, pending_rotation_confirm
G9. The only abandon button is on a pending approval row. Once a member has approved the last thing asked of them, they can no longer abandon a rotation stuck on somebody else ChatRoomDetailScreen.kt:413
G10. The DEAL row does not say who is withheld, which is the whole of what that approval decides ChatRoomDetailScreen.kt:399-410

G9 is a bug today only in a narrow case: a member who has confirmed and is waiting on the certificate. Removing CONFIRM makes it the normal case. Every member who has taken part would have no way out of a stalled rotation, and canRotate stays false while one runs, so the group could not start another. Phase 6 is not optional.

G10 is the same kind of gap. Once DEAL is the only approval, it carries all the weight of the decision, and today the row shows none of what is being decided.


Why CONFIRM was never a decision

ShareRefreshApprovalStep.CONFIRM's KDoc gives two reasons for the gate. Neither needs a person.

  • "This is what stops a coordinator substituting a table the recipients never dealt." The check that stops it is FrostRefresh.participantStep2. It decrypts and sums the dealt values, runs the Feldman check against the commitments, recomputes every public share, and checks the new share against its public share and the table against the threshold key. It runs before the prompt appears, whatever the person does. A substituted table fails there and the rotation fails out loud (raiseIfFaulty, fail, FAILURE). It never reaches the prompt. The prompt shows nothing the person could check themselves.
  • "The one confirmation per base generation this device will ever give." The write-once claim is ShareRefreshConfirmation, taken in the same transaction as the PENDING row (confirmAndStore). It holds whether or not a person tapped. A second refresh from the same base is refused by the database, not by the owner.

The only thing a person could do at CONFIRM that the device cannot is change their mind. Abandon still covers that, from the whole run once Phase 6 lands.

The same argument covers the key state at row 7. For a rotation this device completed, the new generation's public-share table, the refresh id and the retired ids are all facts the device holds and has checked against the certificate. Exactly one key state can be true. If the proposal matches it, a person has nothing to add. That is the rule automatic-key-ceremony.md Phase 0.5 set for the ceremony's own key state. fc437d05 kept rotation states out of it because they say more than a ceremony does. Phase 5 adds the rule for what they say.


Phase 0: decisions

An hour. Each has a recommendation.

Decided 2026-11-20: all six as recommended. Execution began the same day.

# question recommendation if decided otherwise
R1 What does taking part consent to? The whole rotation. dealApprovedAt keeps its column and name and now means "agreed to take part, with these members withheld". The member is not asked about this rotation again, and neither is the signature on its key state when that state is exactly what the rotation implies Keep row 7 asked. A rotation still needs t taps after the certificate before the old shares are wiped, and in the meantime the old shares stay on every device
R2 Is proposing the proposer's approval? Yes, once the proposal is a dialog that names who takes part and who is withheld, stale members included. The reason the proposer is asked today is that "proposing is not agreeing to withhold whomever the form defaulted to". The fix for that is a form that shows its defaults. Asking again afterwards does not fix it The proposer taps twice: the button, then the row. Harmless, but it is the same decision twice
R3 Anything new on the wire? No. Kinds 30340-30345, the tags and the ordering stay. A Giza build from before this change keeps its gates, and a rotation that includes it finishes when that member taps, as today. Rotation is behind ExperimentalFeatures.shareRefresh, off in release, so no shipped build is affected —
R4 The schema No migration. confirmApprovedAt stays, unread, with KDoc saying earlier builds wrote it. ShareRefreshApprovalStep.CONFIRM stays in the enum because approvalRequestedThrough stores it by name on rows already written. This matches automatic-key-ceremony.md Phase 0.3 Drop both in a schema bump: a migration and a migration test for two nullable values nothing reads
R5 Bindings (10b) Still asked. A key state that adds a frost_member binding re-binds an id to a new identity. That is governance, not arithmetic, and fc437d05 was right to keep it asked. Phase 5 vouches only for a state whose bindings are exactly the ones already signed for that generation, which right after a rotation means none —
R6 A timer that abandons by itself? No, as in the ceremony. The Shares section says who the rotation is waiting on and since when. Whether that is too long is for the group to judge —

Phase 1: pin today's gates

Two hours. Do this before changing anything.

ShareRefreshRitualJvmTest already has the multi-device harness (devicesFor, pump, approveAll, approveSigning). What it lacks is a test that says where the gates are. approveAll approves "whatever they are asked, until nobody is asked anything", which passes whatever the gates are.

Add, against today's behaviour:

  • today's gates, pinned: propose in a 2-of-3. Every recipient approves exactly once (DEAL), then pump until quiet. Every recipient is at pendingApproval == CONFIRM, nobody has a PENDING generation, and the outbox holds round 1 and cmsg1 and nothing more. Phase 2 flips this assertion, and that flip is the change.
  • the key state, pinned: run a rotation to COMPLETE with approveAll, then pump. The g+1 key-state session is open and awaiting approval on every recipient, and generation g is still RETIRING, not WIPED. Phase 5 flips this one.
  • counted asks: a helper asksOf(device) that counts the TYPE_SHARE_REFRESH_APPROVAL_NEEDED lines plus signing approval lines a device wrote for one rotation. Today it is 3 per recipient. Phases 2, 4 and 5 take it to 1.

Phase 2: the manager stops at taking part and nowhere else

Half a day. Closes G1 to G3.

In ShareRefreshManager:

  • advance loses the confirmApprovedAt block (:415-418). The DEAL gate at :391 stays and gets a comment: it is now the only gate. The steps after it are already idempotent. ownMessage(ROUND_2) guards the send, and confirmAndStore is idempotent for the session that holds the claim. Removing the gate adds no path. It only stops cutting the existing one short.

  • pendingApproval becomes:

    if (session.stage == COMPLETE || session.stage == FAILED) return null
    // ...key, base, myId as now...
    if (myId !in session.recipientIdList()) return null
    return if (session.dealApprovedAt == null) ShareRefreshApprovalStep.DEAL else null
    

    It is still "a step is pending exactly when advance would stop at it", which is now easy to see.

  • approve acts on DEAL only. A CONFIRM approval from a screen left open across the upgrade cannot arrive any more (pendingApproval never returns it), but the when keeps the arm as a logged no-op so the enum stays exhaustive.

  • announceApprovalNeeded only ever receives DEAL. The CONFIRM arm of its when stays with a one-line comment saying nothing reaches it, so nobody takes it for live wording.

  • KDoc. The object's KDoc (:63-64, "at two gates") and ShareRefreshApprovalStep's become the record of what a rotation has ever asked: one step still asked, one kept so old rows decode. Move the reasoning in Why CONFIRM was never a decision into the CONFIRM KDoc, so the next reader does not put the gate back. ShareRefreshSession.confirmApprovedAt gets "written by builds before docs/rotate-shares-single-approval.md; read by nothing".

A round-2 fault keeps the failure path it has today: raiseIfFaulty, fail, broadcast FAILURE. The difference is that it can now happen with nobody looking. The transcript's ended line already covers that, and Phase 6 puts it in the Shares section too.

Tests, in ShareRefreshRitualJvmTest:

  • Phase 1's pinned assertion, flipped: each recipient approves once and every device reaches COMPLETE at generation g+1, with no other call;
  • pendingApproval never returns CONFIRM, sampled after every pump pass;
  • the last recipient to approve sends round 1, and on the next pass round 2 goes out with no further call;
  • a coordinator that substitutes cmsg1 in transit (the harness tampers with it) fails the rotation on every honest recipient, with no approval in between, and nobody holds a PENDING generation. This was always the protection, and the test shows it no longer depends on a person;
  • the fork rule still holds without a person: two proposals from one base, both approved at DEAL by an overlapping recipient. That recipient confirms one and fails the other, and at most one certificate exists. This is the existing "a device confirms one refresh per generation" test, run with the confirm gate gone. If it needed the gate to pass, the gate was carrying D3a, and that has to be found now;
  • "nothing of a member's own goes out before they approve" passes unchanged (until Phase 4 changes the proposer's half of it).

Phase 3: running rotations resume without a message

Half a day. Closes G7. Ships with Phase 2.

With the CONFIRM tap gone, a rotation paused at CONFIRM by the old build has cmsg1 stored, is waiting on its own round 2, and will receive no more messages. Without a sweep it never moves.

/**
 * Moves every running rotation of this user's as far as its stored messages
 * allow. What a tap on "Store your new share" used to do, for rotations that
 * already have everything they need and will receive nothing more.
 */
suspend fun resumeRunning(database: GizaDatabase, userPublicKey: HexKey, nostrPrivateKey: ByteArray): Int
  • What it selects: a new ShareRefreshDao.getRunningSessionsFor(userPublicKey), sessions not COMPLETE or FAILED, oldest first. It does not filter on dealApprovedAt. A coordinator waiting on others' round 1 and a withheld device waiting on the certificate also have work a sweep can finish, and advance stops at the DEAL gate for anyone not yet approved.
  • What it calls: for each, look up the room (skip a gone room with a warning) and advance. advance already returns at its first missing input.
  • Where it is wired: DatabaseNostrRepository.resumeRunningCeremonies, after ChillDkgRitualManager.resumeRunning, under the same storeNostrEventMutex. Rename it to resumeRunningRituals while there, or leave the name and widen its KDoc. It runs from SynchronizationViewModel once the live subscription is open, so anything it publishes goes into a pipeline that is already running.
  • Behind the flag. With ExperimentalFeatures.shareRefresh off it resumes nothing. A release build has no rotations to resume. If one somehow exists, it was refused on arrival.

The same sweep covers the second half of G6 for upgrades. A g+1 key-state session that an old build left awaiting approval is re-checked against vouchesFor (Phase 5). That part lands with Phase 5, which owns the rule.

Tests:

  • the upgrade case: a session with cmsg1 stored, dealApprovedAt set, confirmApprovedAt null, approvalRequestedThrough = CONFIRM, which is exactly what the old build leaves. Run the sweep with no message arriving. It publishes round 2, and on the harness the rotation completes;
  • a session never approved at DEAL is advanced but sends nothing;
  • a FAILED or COMPLETE session is not touched;
  • two sweeps in a row publish nothing twice;
  • with the flag off, the sweep does nothing.

Phase 4: proposing is the proposer's approval

Half a day. Closes G4. Only if R2 is decided as recommended.

The proposer is asked today because the button commits them to a withheld list they were never shown. The fix is to show it.

  • A dialog behind Rotate shares. AlertDialog in ChatRoomDetailScreen, in the style of the existing rotate_shares_without_* dialog. It shows:

    • Taking part: every live member's name;
    • Left out until they are brought back: every stale member, who proposeRefresh withholds again automatically (:139-143). Today the proposer never sees this list;
    • the existing shares_rotation_caveat copy;
    • confirm Rotate shares, dismiss Not now.

    It reads from a new ChatRepository.rotationPreview(localChatRoom) that runs the same selection proposeRefresh does, and refusal, so a rotation that would be refused says why before the tap rather than as a snackbar after it. proposeRefresh and the preview share one private function for the recipient/withheld split, so they cannot drift.

  • The removal dialog (rotate_shares_without_body) gains the same stale list when there is one. The removed member is already named.

  • proposeRefresh sets dealApprovedAt = now on the session it creates. The KDoc at :111-116 becomes: proposing, from a dialog that named everyone withheld, is agreeing to the rotation, and the proposer is not asked again. proposeWithout inherits it.

  • The repository API keeps rotateShares(localChatRoom). The dialog is where the decision is shown, and the manager does not need to know a dialog exists.

Strings go in strings.xml, sentence case: rotation_taking_part, rotation_left_out_until_brought_back, not_now if not already there.

Tests:

  • the proposer's half of "nothing of a member's own goes out before they approve" flips. The proposer publishes the proposal and its round 1 in the one proposeRefresh call, and writes no approval-needed line. The other recipients' half is unchanged;
  • rotationPreview and proposeRefresh agree on recipients and withheld for every fixture: 0, 1 and 2 stale, and a retired member;
  • a preview of a rotation that refusal rejects carries the reason and no recipients.

Phase 5: a rotation's key state signs itself

A day. Closes G5 and G6.

GroupKeyStateManager.vouchesFor signs exactly one statement per room: the key state of a ceremony this device finished. Rule 8 (fc437d05) keeps every generation state out. This phase replaces rule 8 with the rule for the one generation state that can be true.

The rule. For a claim with generation = h ≥ 1, rules 1 to 6 stand as they are. Rules 7 and 8 become:

  1. No state for this room is signed here at generation h or later. This replaces "no state at all", which would refuse every rotation, since a room that rotates already has a generation-0 state.
  2. This device completed the rotation that made h:
    • KeyShareGeneration(key, h) exists here, is ACTIVE, and holds a secret share. A device withheld from h cannot sign at h anyway, and should not vouch for a table it did not help make;
    • its refreshSessionId equals the claim's frost_refresh, and that ShareRefreshSession is COMPLETE here;
    • the claim's frost_pubshares equals ShareGenerations.publicSharesHash( that row's publicShares );
    • the claim's frost_retired ids equal the ids RETIRED in this device's roster at h;
    • the claim's bindings equal the bindings already in a group-signed state at h on this device. Right after a rotation that is none. A state that adds a binding is a 10b re-bind and stays asked (R5);
    • the signing session's generation is h.
  3. Path and parent match the room's signed state, not only the admin path. proposeGeneration copies them from keyStateFor, so a claim whose path or birth certificate differs from what the room already signed is not the one true statement.

Each condition calls what already exists (claimFrom, stateAmong, ShareGenerations.publicSharesHash, the key-share DAO). None of it is copied, for the reason automatic-key-ceremony.md Phase 7 gives: the rule for signing and the rule for keeping must be one function.

Asking again when the answer can change (G6). Vouching is decided once, when the proposal arrives (FrostSigningManager.kt:447). For a rotation that is often too early. The coordinator proposes the g+1 state the moment its own certificate verifies, and a recipient can receive the proposal before the certificate, while h is still PENDING here. Two changes:

  • FrostSigningManager.resumeAt(database, room, dkgSessionId, generation), which ShareRefreshManager.advance already calls after activate, runs signsAsItsOwnKeyState on each open session at that generation before advancing it, and approves the ones it vouches for;
  • Phase 3's sweep does the same for open key-state sessions, for the upgrade case: a session an old build left asking.

signsAsItsOwnKeyState already refuses a session that has been approved or declined, so a person who answered first keeps their answer.

What stays asked. Anything that fails a check takes the normal path: the approval line, the proposal, the member's decision. Failing a check is not a reason to decline. It means the device cannot vouch for the statement, so a person has to. That includes a key state proposed by a member whose rotation this device never saw. That should not happen, and if it does, a person should look.

Tests, in ShareRefreshRitualJvmTest and KeyStateSignsItselfJvmTest:

  • Phase 1's key-state assertion, flipped: each recipient approves DEAL once. With no other call, the group signs the g+1 key state, every device wipes generation g, and the group signs at g+1 as the same room. asksOf is 1 per recipient (0 for the proposer after Phase 4);
  • the race: the proposal for the g+1 state is delivered before the certificate. It is not vouched for on arrival, and is vouched for when the certificate activates h;
  • each check broken on its own leaves the session at isAwaitingApproval:
    • a different frost_pubshares;
    • a frost_refresh naming a rotation this device did not complete;
    • a retired id added or missing;
    • a new binding (the 10b test's re-bind state stays asked, so its approveSigning(listOf(alice, bob)) call is still needed);
    • a session at generation h−1;
    • a device withheld from h;
    • a room already holding a signed state at h;
    • a path or parent that differs from the room's signed state;
  • fc437d05's regression stays covered: a generation-1 state on devices that hold no first state still needs every rule to pass, and is asked when one fails;
  • every existing KeyStateSignsItselfJvmTest case passes unedited for generation-0 states.

Phase 6: the Shares section, with one approval

A day. Closes G8 to G10.

Under CLAUDE.md's rules: strings in the catalogue in sentence case, spacing and colour from the theme, outcomes through rememberNotifier, Decorative on any icon whose label sits beside it.

The approval row says what it decides (G10).

  • SharesSummary.PendingApproval gains withheld: List<Withheld>, each with a display name and STALE or RETIRED, filled in by DatabaseChatRepository.sharesSummary from the session's withheldStandings().
  • The REFRESH_DEAL row's headline becomes Take part in rotating the shares, as now. Its supportingContent becomes one of:
    • Every member takes part.
    • Without Alice until they are brought back, and without Bob for good. Built from format arguments, not concatenation, with a plural-safe form for one name or several.
    • A line on what taking part now commits to: Your device sends its part, stores your new share and signs the group's new key state without asking again.
  • The row keeps Abandon and Approve.

REFRESH_CONFIRM goes (G8). The enum value in SharesSummary.PendingApproval.Kind is UI state only, so it is removed outright, along with its arm in sharesSummary and approveShares and the pending_rotation_confirm string. Run m3-extract-strings.py --list afterwards to catch any other orphans.

A running rotation is visible, and can be abandoned, for its whole run (G9).

  • SharesSummary gains running: Running?, with the session id, the stage in words (dealing, storing the new shares, signing the new key state), the members it is waiting on, the time of the newest ShareRefreshMessage for the session, and canAbandon (this device is a recipient). The rotation counts as running until the g+1 key state is signed, not only until the certificate, because that signature is what the old shares wait on.
  • "Waiting on" comes from stored rows: recipients with no round 1, then no round 2, then the coordinator's sum or certificate, then the key-state session's missing signers. The stall clock is dated from the newest message, not the newest transcript line, for the reason automatic-key-ceremony.md's build table gives: ShareRefreshManager.record must store a message once, on first arrival. Check that it does (:343-344 upserts on every redelivery, which rewrites the row) and fix it the way ChillDkgRitualManager.record was fixed.
  • The Shares section shows it as a card above the members: Rotating the shares, the stage, Waiting on Carol since yesterday, and Abandon when canAbandon, behind the existing confirmation. It sits above the member list because a stall is the most important thing in the section when there is one.
  • A rotation that ended shows its reason from failureReason until the next one starts, so a fault found with nobody looking is not lost in the transcript.

The transcript needs no code change. Check it rather than assume it. CONFIRM approval-needed lines already written by the old build still render, and the automatic round 2 writes the same TYPE_SHARE_REFRESH_CONFIRMED line a tapped one did. Each device now writes one approval-needed line per rotation instead of two.

Tests:

  • a SharesSummary test that the DEAL row carries the withheld list, and that no REFRESH_CONFIRM kind exists;
  • running names the right members at each stage, including the key-state stage after the certificate;
  • canAbandon is true for a recipient who has already approved, and false for a withheld member;
  • a redelivered round 1 does not move the stall clock;
  • ./gradlew :composeApp:m3Audit at its budgets, floors not moved.

Phase 7: the record, and three emulators

Half a day of docs, then a device session.

  • frost-share-refresh.md: Phase 7's Approval gates table shrinks to one row, with a short history of CONFIRM (why it existed, why it went, why the enum value and column remain). Phase 8's step 2 says the key state signs itself under the rule in this plan's Phase 5. Phase 11's bullet the two approvals becomes one. The build table gains a row pointing here.
  • automatic-key-ceremony.md, What this does not do: "It does not automate signatures other than the key state" gains "a rotation's key state is automated too, by rotate-shares-single-approval.md".
  • README.md: this note's row, and frost-share-refresh.md's row, which still says "not built" although it is.
  • This note: a Built header and a table of where the build chose differently.

On three emulators (Bob, Charlie, Medium), a debug build so the flag is on:

  1. A 2-of-3 room. Bob presses Rotate shares and confirms the dialog. Charlie and Medium each tap Approve once. Nobody touches anything else. All three show generation 1, and the transcript shows the key state signed and no second approval line.
  2. Remove Medium. Bob rotates without them from the dialog. Charlie taps once. Medium's standing is retired.
  3. The upgrade: on the current build, stop a rotation at Store your new share on all three, install this build over it, and open the app. It should finish from the sweep alone.
  4. Charlie approves and then force-stops the app. Bob's and Medium's Shares section name Charlie and how long they have been waiting, and Abandon ends the rotation on all three.

./gradlew check must pass: m3-audit, brand-audit, wallet-audit.


What this does not do

  • Since then: a rotation that withholds nobody new -- only members already stale, and members the group's signature removed as admin -- asks nobody at all, the proposer's fellow recipients included (admin-change-rotation.md).
  • It does not run while the app is closed. The live subscription is foreground-only (long-running-sync.md). After approving, each member's device still has to be opened once the others have dealt, again once the coordinator has summed, and again for the key state. What changes is that opening the app is enough.
  • It does not change the protocol. Every recipient still has to take part (D2), the majority and write-once rules (D3) still hold, and the old share is still wiped only after the group signs the new generation (D6). This plan only changes who presses what.
  • It does not change older peers. A build from before this change still asks at both gates, and a rotation that includes one waits for that member's taps. D5's capability check is still unbuilt, so nothing tells the proposer in advance.
  • It does not automate repair. A helper's approval in a repair (10a) spends its share's secrecy on the target's behalf. That is a decision about someone else, and stays asked.
  • It does not automate re-binding an id to a new identity (10b, R5).
  • It does not add a way to decline. A member who does not want to take part abandons, which ends the rotation for everyone. A rotation cannot finish without every recipient, so a quiet "no" and a loud one end the same way. The loud one is just faster.

Order and size

phase size depends on
0 decisions an hour —
1 pin today's gates two hours —
2 manager: one gate half a day 1
3 resume sweep half a day 2
4 proposing is approving half a day 2, R2
5 the key state signs itself a day 2
6 Shares section a day 2, 5 (for the key-state stage)
7 docs, emulators half a day plus a session all

Phases 2 and 3 ship together. With 2 and without 3, a rotation paused by the old build at Store your new share sits still until a message happens to arrive. Phase 6's abandon card ships with Phase 2 or before it. Without it, a member who has approved has no way to end a stalled rotation (G9). Phases 4 and 5 are independent of each other and can land in either order. Everything is behind ExperimentalFeatures.shareRefresh, so no phase changes a release build.